Encosta São José in the neighborhood of Liberdade, Salvador
November 23, 2020BACKGROUND STABILIZATION WORK WITH INFRASTRUCTURE RECOVERY
ELABORATION OF THE BASIC AND EXECUTIVE PROJECTS OF TIRED CURTAIN AND GRAPED SOIL;
22.5 KM FROM TIRANTES
12 THOUSAND M2 M2 OF SHOT CURTAIN
11, 6 KM FROM MONOBRRA CLAMP
9.3 THOUSAND M2 OF CLAMPED SOIL
DRAINAGE SERVICES